How much is the quotation for house decoration of

2022-07-22
  • Detail

Project 1: Foundation Engineering

wall chipping (gypsum ash) 916.00

wall blank base treatment 458.00

wall/ground cement mortar leveling 1925.00

demolition of brick wall (120 mm) 280.00

project 2: Waterway and circuit engineering

strong and weak current construction (lump sum price) 6080.00

waterway construction (lump sum price) 1550.00

strong and weak current construction Installation of weak current box 100.00

item 3: guest restaurant and aisle

emulsion paint base treatment (putty application) 1800.00

emulsion paint 720.00

gypsum board flat ceiling 225.00

gypsum board linear light trough ceiling 2376.00

shoe cabinet (including door, ecological board) 2040.00

decorative cabinet, wine cabinet 2590.00

decorative cabinet Wine cabinet door 654.00

item 4: master bedroom

latex paint base treatment (putty) 940.00

latex paint 376.00

wardrobe cabinet body (ecological board) 3013.20

wardrobe door (ecological board) 436.00

item 5: secondary bedroom

latex paint base treatment (putty) 840.00

latex paint 336.00

wardrobe cabinet (ecological board) 3013.20

wardrobe door (ecological board) 436.00

item 6: study

emulsion paint base treatment (putty) 660.00

emulsion paint 264.00

bookcase (ecological board) 518.00

tatami cabinet 1243.20

item 7: Kitchen

wall tile general specification (300 × 450 < size ≤ 300 × 600) 1155.00

common specification of floor tiles (size 300 × 300) 275.00

kitchen and sanitary package pipes 351.00

hallway stone paving 50.00

item 8: toilet

wall tile general specification (300 × 450 < size ≤ 300 × 600) 1320.00

common specification of floor tiles (size 300 × 300) 275.00

toilet backfilling and surface leveling 210.00

toilet waterproof treatment 900.00

kitchen and sanitary package pipes 351.00

paving of door stone 50.00

Item 9: balcony

latex paint base treatment (putty) 80.00

latex paint 32.00

General specification of wall tiles (300 × 450 < size ≤ 300 × 600) 990.00

balcony railing base tiling 105.00

package riser 175.50

item 10: miscellaneous

materials upstairs fee 300.00

materials transportation fee 300.00

indoor garbage removal fee 300.00

ground fixation 300.00

finished product protection 300.00

item 11: other charges

third party supervision 1299.00

star level foreman service charge 1000.00

in addition to the above quotation, you can take it as a reference, You might as well come to Wuhan home decoration network to test the quotation, or you can participate in the decoration bidding. The platform can select 3 to 4 suitable decoration companies to measure the house for free, and formulate the decoration plan. You can compare them, and some decoration funds are waiting for you. See the activity page for details http://whjzw.net/zb/。

曲靖皮肤病医院

贵阳癫痫医院

珠海男科医院

长春牛皮癣医院

Copyright © 2011 JIN SHI